Bank Clerk Questions


Q:

Two pipes A and B can fill a tank in 15 min and 20 min respectively. Both the pipes are opened together but after 4 min, pipe A is turned off. What is the total time required to fill the tank ?

A) 15 min 20 sec. B) 16 min 40 sec.
C) 13 min 10 sec. D) 14 min 40 sec.
 
Answer & Explanation Answer: D) 14 min 40 sec.

Explanation:

Part filled in 4 minutes = 4(1/15 + 1/20) = 7/15

 

Remaining part = 1 - 7/15 = 8/15

 

Part filled by B in 1 minute = 1/20

 

1/20 : 8/15 :: 1 : k

 

k = (8/15 )x 1 x 20 = 10( 2/3) min = 10 min 40 sec.

 

The tank will be full in (4 min. + 10 min. 40 sec) = 14 min 40 sec.

Report Error

View Answer Report Error Discuss

Filed Under: Pipes and Cistern
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

7 9051
Q:

If M $ N means M is the brother of N; M # N means M is the mother of N; M * N means M is the daughter of N. Then in I # J $ K * L, who is the father ?

A) L B) K
C) J D) I
 
Answer & Explanation Answer: A) L

Explanation:

I is the mother of J, J is the brother of K and K is the daughter of L. Hence , L is the Father.

Report Error

View Answer Report Error Discuss

Filed Under: Blood Relations
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

16 9035
Q:

Train X crosses a stationary train Y in 60 seconds and a pole in 25 seconds with the same speed. The length of the train X is 300 m. What is the length of the stationary train Y ?

A) 360 m B) 420 m
C) 460 m D) 320 m
 
Answer & Explanation Answer: B) 420 m

Explanation:

Let the length of the stationary train Y be LY
Given that length of train X, LX = 300 m
Let the speed of Train X be V.
Since the train X crosses train Y and a pole in 60 seconds and 25 seconds respectively.
=> 300/V = 25 ---> ( 1 )
(300 + LY) / V = 60 ---> ( 2 )
From (1) V = 300/25 = 12 m/sec.
From (2) (300 + LY)/12 = 60
=> 300 + LY = 60 (12) = 720
=> LY = 720 - 300 = 420 m
Length of the stationary train = 420 m

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

7 9034
Q:

Study the following information and answer the given question:

Point A is 10m to the south of B.Point G is 3 m to the east of A. Point H is 5 m to the south of G. Point D is 6 m to the west of H. Point C is 10 m to the north of D. Point K is 6 m to the east of C. Point L is 5 m to the north of K.

How far and in which direction is point B from point L?

A)

5 metres south

B)

4 metres east

C)

6 metres north

D)

3 metres west

 
Answer & Explanation Answer: D)

3 metres west



Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Verbal Reasoning - Mental Ability
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

2 9031
Q:

Marathon is to race as Hibernation is to

A) Eat B) Sleep
C) Winter D) Dream
 
Answer & Explanation Answer: B) Sleep

Explanation:

Marathon is to Race as Hibernation is to Sleep.

 

Marathon is a long race in the similar way Hibernation refers to a long sleep.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

7 9028
Q:

50 men can build a tank in 40days, but though they begin the work together, 5 men quit every ten days. The time needed to build the tank is ?

A) 50 days B) 48 days
C) 47.5 days D) 49 days
 
Answer & Explanation Answer: A) 50 days

Explanation:

50 men can build a tank in 40 days 

Assume 1 man does 1 unit of work in 1 day

Then the total work is 50×40 = 2000 units

 

50 men work in the first 10 days and completes 50×10 = 500 units of work

45 men work in the next 10 days and completes 45×10 = 450 units of work

40 men work in the next 10 days and completes 40×10 = 400 units of work

35 men work in the next 10 days and completes 35×10 = 350 units of work

So far 500 + 450 + 400 + 350 = 1700 units of work is completed and

 

Remaining work is 2000 - 1700 = 300 units

 

30 men work in the next 10 days. In each day, they does 30 units of work.

 

Therefore, additional days required = 300/30 =10

 

Thus, total 10+10+10+10+10 = 50 days required.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

12 9024
Q:

egg: fish : : ________ : plant

A) seed B) stem
C) root D) leaf
 
Answer & Explanation Answer: A) seed

Explanation:

Fish is from eggs whereas plant is from seeds.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE , TOEFL
Job Role: Bank Clerk , Bank PO

9 9016
Q:

Which of the following is not a sedimentary structure?

A) graded bedding B) rock color
C) ripple marks D) mudcracks
 
Answer & Explanation Answer: B) rock color

Explanation:

Except Rock color, all other Graded bedding, Ripple marks and Mud cracks are sedimentary structures.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

10 9002