Analyst Questions


Q:

A debit signifies a decrease in

A) revenues B) liability
C) owner's equity D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Accounts Payable
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 3698
Q:

Which of the following definitions describes a chemical hazard?

A) Microorganisms, such as bacteria, fungus, mold, or viruses that can cause illness B) These hazards can lead to injuries to the joints or muscles by way of heavy, frequent lifting, repetitive tasks
C) Can be present in dust, fumes, liquids, solids, mists, vapors, or gases of products used at a site or released during a construction job D) The most commonly thought of hazards for construction
 
Answer & Explanation Answer: C) Can be present in dust, fumes, liquids, solids, mists, vapors, or gases of products used at a site or released during a construction job

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 3690
Q:

Which letter indicates systolic pressure?

A) i B) b
C) c D) a
 
Answer & Explanation Answer: D) a

Explanation:

a -  at the peak of changes in blood pressure indicates the systiolic pressure.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

7 3689
Q:

Study of the sun is called

A) Coronagraphy B) Seismography
C) Helioseismology D) Heliography
 
Answer & Explanation Answer: C) Helioseismology

Explanation:

Helioseismology is the study of the solar interior using observations of waves on the Sun's surface. It has done much to improve our understanding of the interior of the Sun, testing the physical inputs used to model stellar interiors and providing a detailed map of the Sun's structure and internal rotation.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

4 3687
Q:

What organelle allows some protists to detect light?

Answer

An organelle called Eyespot allows some protists to detect light. It allows the cells to sense light direction and intensity and respond to it by swimming either towards the light (positive phototaxis) or away from the light (negative phototaxis).


 


Eyespot is a photoreceptive organelle found in the flagellate or (motile) cells of green algae and other unicellular photosynthetic organisms such as euglenids.


 


Eyespot-mediated light perception helps the cells in finding an environment with optimal light conditions for photosynthesis. Eyespots are the simplest and most common "eyes" found in nature, composed of photoreceptors and areas of bright orange-red pigment granules.

Report Error

View answer Workspace Report Error Discuss

Subject: Biology Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

4 3686
Q:

I shrink smaller every time I take a bath.

What am I ?

Answer

A Soap.


Yes, it gets shrinks smaller every time we take a bath.

Report Error

View answer Workspace Report Error Discuss

2 3685
Q:

Fill in the blank with an appropriate word from the following options.

Usually the room tariff in this hotel is higher. At present, it is low because of the------- season.

A) Peak B) Off
C) Down D) Slow
 
Answer & Explanation Answer: B) Off

Explanation:

Season can be either at peak or off.
Presently it is low, that is because of OFF season.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

6 3685
Q:

K, L and M can do a piece of work in 20, 30 and 60 days respectively. In how many days can K do the total work if he is assisted by L and M on every third day ?

A) 15 days B) 13 days
C) 12 days D) 10 days
 
Answer & Explanation Answer: A) 15 days

Explanation:

In one day work done by K = 1/20

Work done by K in 2 days = 1/10

 

Work done by K,L,M on 3rd day =1/20 + 1/30 + 1/60 = 1/10

Therefore, workdone in 3 days is = 1/10 + 1/10 = 1/5

 

1/5th of the work will be completed at the end of 3 days.

The remaining work = 1 - 1/5 = 4/5

1/5 of work is completed in 3 days

Total work wiil be done in 3 x 5 = 15 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

3 3684