Job Roles

Q:

Two pipes A and B can fill a tank in 24 hours and 1717 hours respectively. Harihar opened the pipes A and B to fill an empty tank and some times later he closed the taps A and B , when the tank was supposed to be full. After that it was found that the tank was emptied in 2.5 hours because an outlet pipe "C" connected to the tank was open from the beginning. If Harihar closed the pipe C instead of closing pipes A and B the remaining tank would have been filled in :

A) 2 hours B) 8 hours
C) 6 hours D) 4 hours
 
Answer & Explanation Answer: B) 8 hours

Explanation:

Efficiency of Inlet pipe A = 4.16%       10024 

 

Efficiency of Inlet pipe B = 5.83%      1001717  

 

Therefore, Efficiency of A and B together = 100 %   

 

Now, if the efficiency of outlet pipe be x% then in 10 hours the capacity of tank which will be filled = 10 *  (10 - x)

 

Now, since this amount of water is being emptied by 'C' at x% per hour, then

 

 10x10-xx=2.5 hrs 

 => x = 8 

 

Therefore, in 10 hours 20% tank is filled only. Hence, the remaining 80% of the  capacity will be filled by pipes A and B  in 80/10 = 8 hours 

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

38 16645
Q:

A can do a piece of work in 10 days, B in 15 days. They work together for 5 days, the rest of the work is finished by C in two more days. If they get Rs. 3000 as wages for the whole work, what are the daily wages of A, B and C respectively (in Rs):

A) 200, 250, 300 B) 300, 200, 250
C) 200, 300, 400 D) None of these
 
Answer & Explanation Answer: B) 300, 200, 250

Explanation:

A's 5 days work = 50%  

B's 5 days work = 33.33% 

C's 2 days work = 16.66%     [100- (50+33.33)] 

Ratio of contribution of work of A, B and C = 50 : 3313 : 1623 = 3 : 2 : 1   

A's total share = Rs. 1500 

B's total share = Rs. 1000 

C's total share = Rs. 500  

 

A's one day's earning = Rs.300  

B's one day's earning = Rs.200  

C's one day's earning = Rs.250

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

592 94157
Q:

Amit can do a piece of work in 45 days, but Bharath can do the same work in 5 days less, than Amit, when  working alone. Amit and Bharath both started the work together but Bharath  left after some days and Amit finished the remaining work in 56 days with half of his efficiency but he did the work with Bharath with his complete efficiency. For how many days they had worked together?

A) 6 B) 8
C) 9 D) 12
 
Answer & Explanation Answer: B) 8

Explanation:

    AmitBharatNo.of Days4540Efficiency2.22Percent(=145)2.5 Percent(=140)

 

Amit did the work in 56 days = 56×145×2=2845 

 

Therefore, Rest work 17/45 was done by Amit and Bharath = 174517360 = 8 days

 

 

 

( since Amit and Bharath  do the work in one day = 145+140=17360)

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

30 15628
Q:

A and B runs around a circular track. A beats B by one round or 10 minutes. In this race, they had completed 4 rounds. If the race was only of one round, find the A's time over the course:

A) 8 min B) 7.5 min
C) 12.5 min D) 12 min
 
Answer & Explanation Answer: B) 7.5 min

Explanation:

B runs around the track in 10 min.

 i.e ,    Speed of B = 10 min per round

 Therefore,  A beats B by 1 round

  Time taken  by A to complete 4 rounds 

  = Time taken by B to complete 3 rounds  

 = 30 min 

 

Therefore, A's speed = 30/4 min per round = 7.5 min per round

 Hence, if the race is only of one round A's time over the course = 7 min 30 sec

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

25 10376
Q:

In a race of 800m Kaushik gives Piyush a start of 200m and then loses the race by 20 seconds. What is the speed of Piyush and Kaushik respectively ? If the ratio of respective speeds be 3:2.

Answer

Let the speed of Kaushik be Sk and speed of Piyush be Sp and let the time taken by Piyush be t second then,


 SkSp = 800t+20600t = 23since given ratio


 


t = 20 s


 


Speed of Piyush = Sp = 600/20 = 30 m/s


 


and    Speed of Kaushik = 800/40 = 20 m/s

Report Error

View answer Workspace Report Error Discuss

Subject: Time and Distance Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

8 5778
Q:

For xN, x>1,  and  p=logxx+1q=logx+1x+2 then which one of the following is correct?

A) p < q B) p = q
C) p > q D) can't be determined
 
Answer & Explanation Answer: C) p > q

Explanation:

kl>k+1l+1 for (k,l) > 0 and  k > l 

 

 

 

Let     k = x+1    and   l = x

 

 

 

Therefore, x+1x>(x+1)+1(x)+1

 

 

 

 (x + 1) > x

 

 

 

Therefore, log(x+1)log(x)>log(x+2)log(x+1)

 

 

 

logxx+1 >logx+1x+2

Report Error

View Answer Report Error Discuss

Filed Under: Logarithms
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

33 6437
Q:

The Value of  logtan10+logtan20++logtan890 is

A) -1 B) 0
C) 1/2 D) 1
 
Answer & Explanation Answer: B) 0

Explanation:

= log tan10+log tan890 + log tan20+ log tan880++log tan450  

 

= log [tan10 × tan890] + log [tan20 × tan880 ] ++log1  

 

 tan(90-θ)=cotθ and tan 450=1  

 

= log 1 + log 1 +.....+log 1 

 

= 0.

Report Error

View Answer Report Error Discuss

Filed Under: Logarithms
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

27 5862
Q:

What is the number of digits in 333? Given that log3 = 0.47712?

A) 12 B) 13
C) 14 D) 15
 
Answer & Explanation Answer: B) 13

Explanation:

 Let   Let x=333 333

 

 Then, logx = 33 log3  

 

= 27 x 0.47712 = 12.88224 

 

Since the characteristic in the resultant value of log x is 12

 

The number of digits in x is (12 + 1) = 13 

 

Hence the required number of digits in 333is 13.

Report Error

View Answer Report Error Discuss

Filed Under: Logarithms
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

49 10699