GATE Questions

Q:

A line is an undefined term because it

Answer

A line is an undefined term because of it :


 


1. Contains an infinite number of points


2. can be used to create other geometric shapes


3. is a term that does not have a formal definition


 


In Geometry, unless it's stated, a line will extend in one dimension and goes on forever in both ways.

Report Error

View answer Workspace Report Error Discuss

17 5605
Q:

You drive to the store at 20 kmph and return by the same route at 30 kmph. Discounting the time spent at the store, what was your average speed ?

A) 25 kmph B) 24 kmph
C) 26 kmph D) 22 kmph
 
Answer & Explanation Answer: B) 24 kmph

Explanation:

Average speed=total distance/total time
Let distance to store be  K
then, total time =(K/20)+(K/30)=K/12
and, total time =(2K)
so average speed= 2K / (K/12) = 24kmph.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

3 5601
Q:

Alloy of copper and zinc is called

A) Bronze B) Gold
C) Silver D) Brass
 
Answer & Explanation Answer: D) Brass

Explanation:

alloy_of_copper_and_zinc_is_called1556100441.jpg image

 

Alloy of copper and zinc is called as Brass.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: GATE , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

3 5595
Q:

What has 3 feet but cannot walk?

Answer

We know that 1 yard = 3 feet. 


 


A yardstick which is used for measurement has 3 feet long but it cannot walk.


 

Report Error

View answer Workspace Report Error Discuss

7 5589
Q:

Raghu can do a job in 12 days alone and Sam can do the same job in 15 days alone. A third person Aru whose efficiency is two-third of efficiency of both Ram and Shyam together, can do the same job in how many days alone?

A) 10 B) 12
C) 13 D) 15
 
Answer & Explanation Answer: A) 10

Explanation:

One day work of Raghu and Sam together = 1/12 + 1/15 = 9/60 = 3/20

Aru efficiency = 2/3 of (Raghu + Sam)

Number of days required for Aru to do thw work alone = 3/2 x 20/3 = 10 days. 

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

9 5576
Q:

Find the speed of stream if a boat covers 36 km in downstream in 6 hours which is 3 hours less in covering the same distance in upstream?

A) 1.5 kmph B) 1 kmph
C) 0.75 kmph D) 0.5 kmph
 
Answer & Explanation Answer: B) 1 kmph

Explanation:

Speed of the boat upstream = 36/9 = 4 kmph

Speed of the boat in downstream = 36/6 = 6 kmph

Speed of stream = 6-4/2 = 1 kmph

Report Error

View Answer Report Error Discuss

18 5572
Q:

Kamal consistently runs 240 meters a day and on Saturday he runs for 400 meters. How many kilometers will he have to run in four weeks ?

A) 5.75 kms B) 7.36 kms
C) 8.2 kms D) 6.98 kms
 
Answer & Explanation Answer: B) 7.36 kms

Explanation:

Total running distance in four weeks = (24 x 240) + (4 x 400)

= 5760 + 1600

= 7360 meters

= 7360/1000

=> 7.36 kms

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

7 5564
Q:

A passenger train is moving at a speed of 120 km/hr. If the length of the train is 101 meters, how long will it take to cross a railway platform 154 meters long ?

A) 6.24 sec B) 6.58 sec
C) 7.325 sec D) 7.65 sec
 
Answer & Explanation Answer: D) 7.65 sec

Explanation:

Here total distance = 154 + 101 = 255 mts
Given speed = 120 kmph = 120x5/18 m/sec
Hence, Time = d/s = 255x18/120x5 = 7.65 sec

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

8 5563