A, B and C can complete a work in 20, 24 and 30 days respectively. All three of them starts together but after 4 days A leaves the job and B left the job 6days before the work was completed. C completed the remaining work alone. In how many days was the total work completed?
Radius of cross section of a solid right circular cylindrical rod is 3.2 dm. The rod is melted and 44 equal solid cubes of side 8 cm are formed. The length of the rod is (Take Π = 22/7)
If compound interest received on a certain amount in the 3rd year is Rs. 1,240, what will be the compound interest (in Rs) for the 4th year on the same amount at 9% rate of interest?
If the average total cost are Rs 54, average variable cost is Rs 36 and quantity produced is 2500 units, find the total fixed costs (in Rs) of the firm?