Q:

In the Determine Budget processes the project schedule

A) is not one of the inputs to these processes. B) is used to allocate the project budget to the various project activities.
C) is used to assign costs to the time period when the costs will be incurred D) is used to determine the size of the contingency component of the budget after all scheduled costs are accounted for.
 
Answer & Explanation Answer: C) is used to assign costs to the time period when the costs will be incurred

Explanation:

“This [project schedule] information can be used to aggregate costs to the calendar periods when the costs are planned to be incurred.” PMBOK [7.2.1.4]

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3579
Q:

The triple constraints of Project Management are frequently discussed in other contextx such as marketing classes and a variety of other subjects. The interaction between _____, ______, and _______can be seen as a triangle, with the three sides impacting the others.

A) quality, resources, time B) money, resources, quality
C) scope, quality, planning D) time, scope, cost
 
Answer & Explanation Answer: D) time, scope, cost

Explanation:

Scope, quality, and cost are the triple constraints. Quality is a function of these three areas and can impact them; however it is not considered one of the components of the triple constraint. Therefore, Answer A, B, and C are incorect.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3574
Q:

User can define and use their own transaction types for Assets accounting in  a SAP R/3 system

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:
Report Error

View Answer Workspace Report Error Discuss

Subject: SAP FI

0 3539
Q:

An important tool for project scope management is

A) Fast tracking B) Work breakdown structure
C) Crashing D) A Gantt Chart
 
Answer & Explanation Answer: B) Work breakdown structure

Explanation:

Work breakdown structure is an important tool for project scope management.

 

Project Scope Management refers to the set of processes that ensure a project’s scope is accurately defined and mapped. Scope Management techniques enable project managers and supervisors to allocate just the right amount of work necessary to successfully complete a project—concerned primarily with controlling what is and what is not part of the project’s scope.

Report Error

View Answer Report Error Discuss

8 3537
Q:

Personnel Calculation Rule can contain several calculation formula depending on the definition and use of the rule.

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:
Report Error

View Answer Workspace Report Error Discuss

Subject: SAP HR

1 3518
Q:

If routers in a single area are configured with the same priority value, what value does a router use for the OSPF Router ID in the absence of a  loopback interface?

A) The Lowest IP address of any physical interface B) The Highest IP address of any physical interface
C) The Lowest IP address of any logical interface D) The Highest IP address of any logical interface
 
Answer & Explanation Answer: B) The Highest IP address of any physical interface

Explanation:

At the moment of OSPF process startup, the highest IP address on any active interface will be the Router ID (RID) of the router . If you have a loopback interface configured (logical interface), then that will override the interface IP address and become the RID of the router automatically.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3517
Q:

When will the configure DNS Server Wizard not permit you to configure a Windows 2000 DNS server as a root server?

A) When Active Directory is installed on the DNS server B) When the DNS server has a dynamic IP address
C) When the DNS server is connected to the Internet D) When another server is configured to use the DNS server as a forwarder
 
Answer & Explanation Answer: C) When the DNS server is connected to the Internet

Explanation:

When a Windows 2000 DNS server is connected to the Internet, the Configure DNS Server Wizard does not permit you to configure this server as a root server.

Report Error

View Answer Report Error Discuss

0 3511
Q:

You type Router#sh ru and receive a % ambiguous command error. why did you receive this message?

A) The command requires additional options or parameters B) There is more than one show command that starts with the letters ru.
C) There is no show command that starts with ru D) The command is being executed from the wrong router mode
 
Answer & Explanation Answer: B) There is more than one show command that starts with the letters ru.

Explanation:

The % ambiguous command error means that there is more than one possible show command that starts with ru. Use a question mark to find the correct command.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3511