Certification Questions

Q:

Which of the following statements about VPRS(cost) are correct?

A. It is controled by the customer master

B. A condition type VPRS is a statistical condition type

C. A condition record can be created for a condition type VPRS (cost)

D. It is controled by the material master

Answer

Answer : B

Report Error

View answer Workspace Report Error Discuss

Subject: SAP SD

2 3854
Q:

You have two switches connected together with two crossover cables for redundancy, and STP is disabled. Which of the following will happen between the switches?

A) The routing tables on the switches will not update B) The MAC forward/;filter table will not update on the switch
C) Broadcast storms will occur on the switched network D) The switches will automatically load-balance between the two links
 
Answer & Explanation Answer: C) Broadcast storms will occur on the switched network

Explanation:

If spanning tree is disabled on a switch and you have redundant links to another switch, broadcast stroms will occur, among other possible problems.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3845
Q:

You have finished physically installing an access point on the ceiling of your office. At a minimum, which parameter must be configured on the access point in order to allow a wireless client to operate on it?

A) AES B) PSK
C) SSID D) WEp
 
Answer & Explanation Answer: C) SSID

Explanation:

The minimum parameter configured on an AP for a simple WLAN installation is the SSID, although you should set the channel and authntication method as well.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3830
Q:

You are working on a new project to develop a new wireless product with ease - of - use features recommended by customers. It is as yet undetermined which features and the extent to which each feature will be incorporated into the product.You have a focus group that will continue to evaluate the features as the project goes forward.The focus group is authorized to suggest changes, as are your engineers and the quality department.As a project manager, what will help you most to minimize the effect of these changes?

A) A change management plan B) A scope management plan
C) Do not continue with the project until all of the features are clearly defined in the scope statement and scope definition. D) This is an expected part of every project. A good project manager will have a communications plan in place to be sure everyone knows what is happening on the project.
 
Answer & Explanation Answer: B) A scope management plan

Explanation:

Answer A is tempting because the problem focuses on changes. However, because we are talking about the elaboration of the product's characteristics, we are talking about scope changes, and therefore Answer B is the best answer. Answer C is also tempting because it is difficult to more forward on a project until the scope is clearly defined (especially in systems development projects), but with products and certain types of web development, scope changes can be frequent, and a formal scope management plan is needed. Answer D is true from a project perspective, but does not addres the scope issues.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3818
Q:

You get a call from a network administrator who tells you that he typed the following into his router:

Router (config) #router ospf 1

Router (config-router) # network 10.0.0.0. 255. 0.0.0 area 0

He tells you he still can't see any routes in the routing table. What configuration error did the administrator make?

A) The wildcard mask is incorrect B) The OSPF area is wrong
C) The OSPF Process ID is incorrect. D) The AS configuration is wrong
 
Answer & Explanation Answer: A) The wildcard mask is incorrect

Explanation:

The administrator typed in the wrong wildcard mask configuration. The wildcard should have been 0.0.0.255 or even 0.255.255.255.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3818
Q:

You are connecting an access point and it is set to root. What does extended service set ID mean?

A) That you have more than one access point and they are in the same SSID connected by a distribution system B) That you have more than one access point and they are in seperate SSIDs connected by a distribution system
C) That you have multiple access points, but they are placed physically in different buildings D) That you have multiple access points, but one is a repeater access point
 
Answer & Explanation Answer: A) That you have more than one access point and they are in the same SSID connected by a distribution system

Explanation:

Extended service set ID means that you have more than one access point and they all are set to the same SSID and all are connected together in the same VLAN or distribution system so users can roam.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3815
Q:

Which indirect valuation module has to be used for variable bonus between 0 - 8% of basic pay ?

A. TARIFF

B. SUMME

C. PRZNT

D. SUMME and PRZNT

Answer

Answer : C

Report Error

View answer Workspace Report Error Discuss

Subject: SAP HR

1 3803
Q:

Subject matters experts (SMEs) are resources that are imperative to the succes of a project. Many times, project managers are not experts in the areas they are managing and frequently must rely upon other's expertise. In which scope - management process are SMEs first used?

A) Scope planning B) Scope definition
C) Initiation D) Scope verification
 
Answer & Explanation Answer: C) Initiation

Explanation:

Initiation is the first step in the scope management process, and expert judgment is one of the techniques routinely utilized. Answers A, B, and D are incorrect because they would come after the initiation process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3794