Q:

If a body weighs 12N on the surface of the earth, how much will it weigh on the surface of the moon where acceleration due to gravity is only one-sixth of that on earth's surface?

A) 12N B) 2N
C) 10N D) 6N
 
Answer & Explanation Answer: B) 2N

Explanation:

Weight is mass x g. Since mass is constant and g is only 16thof that on the earth. The weight on the moon is only 16th of that on the earth. 

Therefore 2N i.e (b) is the answer.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE

14 6793
Q:

Formation of cation occurs by

A) gain of electron B) loss of electron
C) gain of proton D) loss of proton
 
Answer & Explanation Answer: B) loss of electron

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

14 6793
Q:

Which one of the following types of volcanic eruptions is not usually explosive

A) Pelean B) Hawaiian
C) Strombolian D) Vulcanian
 
Answer & Explanation Answer: B) Hawaiian

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Geography

5 6780
Q:

______ is the maximum amount of data that can be stored on a storage medium.

A) Magnetic storage B) Optical storage
C) Solid-state storage D) Storage capacity
 
Answer & Explanation Answer: D) Storage capacity

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: Bank Exams

9 6776
Q:

Pollination is best defined as

A) growth of pollen tube in ovule B) visiting flowers by insects
C) germination of pollen grains D) transfer of pollen from anther to stigma
 
Answer & Explanation Answer: D) transfer of pollen from anther to stigma

Explanation:

Pollination is when pollen grains from an anther, the male portion of a flower, are transferred to a female part of the flower, known as the stigma. In order for pollination to be successful, the pollen grains transferred must be from a flower of the same species.

 

After the pollen grains land on the stigma, they create a pollen tube through the length of the style or stalk connecting the stigma and ovary. Once the pollen tube is complete, the pollen grain will send sperm cells from the grain down to the ovary. When the sperm cells reach the ovary and the egg cells, fertilization will occur, which will result in the formation of the seed. The seed will then be released from the parent plant and will be able to grow into a plant and continue the reproductive cycle using the method of pollination.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

14 6773
Q:

Which among the following Article/Articles of Indian Constitution deals with Emergency provisions?

I. Article 352

II. Article 356

III. Article 360

 

A) Only I B) Both II and III
C) Both I and II D) All I, II and III
 
Answer & Explanation Answer: D) All I, II and III

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: Bank Exams

0 6767
Q:

Math Challenge

find the number maths puzzle

A) 7 B) 44
C) 4 D) 33
 
Answer & Explanation Answer: C) 4

Explanation:

Let the required number be 'N'

given that its quarter i.e; N/4 exceeds its double i.e, 2N by 7

=> N/4 + 7 = 2N

=> N + 28 = 8N

7N = 28

N = 4.

Report Error

View Answer Report Error Discuss

Filed Under: Math Puzzles
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

13 6765
Q:

The boring of India’s first underwater rail tunnel has completed under which river  ?

A) Hooghly River B) Kaveri River
C) Godavari River D) Krishna River
 
Answer & Explanation Answer: A) Hooghly River

Explanation:

The boring of India’s first underwater rail tunnel under the Hooghly River for establishing metro link between Howrah and Kolkata has completed before its scheduled deadline of July 2017. The tunnel is 16.6 km long, out of which 10.8 km runs under the ground. Of this 10.8 km, 502 metres is under the water and the whole thing connects Howrah to the west and Salt lake to the east. It will have 12 stations and six will be underground. Estimated cost of the entire project is $750 million or about Rs 5,000 crores. The final commissioning of the project is expected by December 2019, following which it will be operational. The project is built by Afcons Transtonnelstroy and implemented by Kolkata Metro Railway Corporation Ltd (KMRCL).

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk

5 6764