Questions

Q:

Who wrote the book ' A Passage to India '

A) Ruskin Bond B) Jawaharlal Nehru
C) Victor Banerjee D) E.M.Forster
 
Answer & Explanation Answer: D) E.M.Forster

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

6 3062
Q:

What are the different Adder circuits you studied?

Answer

Adders are generally of five types:


1.Ripple Carry Adder:


The Ripple carry adder(RCA) consists of a building block named Half Adder(HA) which is cascaded to form a Full Adder(FA). These buildingblocks HAs and FAs are also the building blocks of all types of adders.The n full adders are cascaded to form n bit RCA.


The full adder has three input pins(input Ai,input Bi,carryin Ci) and two output pins(Sum and Ci+1).Its equations are:


Sum=Ai^Bi^Ci


Ci+1=Ai.Bi+Bi.Ci+Ai.Ci


 


2. Carry Lookahead Adder:


The Carry Lookahead Adder(CLA) reduces the delay as that in RCA. Let Gi=Ai.Bi, and Pi=Ai^Bi, then Ci+1=Gi+Pi.Ci.


The expressions for Sum and Ci+1 is then defined completely in terms of input pins rather wait for input carry to appear.


 


3. Carry Select Adder:


The carry select adder uses duplicate modules for each combination of input carry(i.e. 1 and 0).The multiplexers then select the appropriate sum and carry output according to the carry output of the preceding stages.


 


4. Carry Skip Adder:


The carry skip adder are as fast as carry lookahead adders which are the fastest adders but its spped decreases to about 20-30% if input operands are 64-bit or more. In these adders we divide the input bit stream into various blocks and make use of two observations:


-if each element of the two bit streams are unequal,i.e. Ai!=Bi than the carry input of the block is equal to the carry input.


-if each element of the two bit streams are equal,i.e. Ai=Bi than the carry input of the block is opposite of the carry input.


 


5. Carry Save Adder:


The carry save adder reduces the addition of three elements into addition of two elements,i.e. if you want sum of nine numbers it reduces it into sum of six numbers. In first step the sum of three numbers is calculated without bothering for the carry.During the second step only carry is calculated which is then added to the generated sum to give the required sum. 

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 3061
Q:

Elements having same atomic numbers but different mass number are called ______.

 

 

A) isotones B) Isotopes
C) isomopes D) isobar
 
Answer & Explanation Answer: B) Isotopes

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: Bank Exams

0 3061
Q:

What is name of Three Indians who has made it to the MIT Technology Review magazine's Innovators under 35 list in 2017 ?

A) Suchi Saria B) Radha Boya
C) Neha Narkhede D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Famous Personalities
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

6 3060
Q:

As decided by UNESCO the 'International Literacy Day' is observed on which of the following day every year?

A) 8th September B) 18th September
C) 8th March D) 18th March
 
Answer & Explanation Answer: A) 8th September

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness

3 3060
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3058
Q:

Which of these was a political goal for farmers?

A) lower prices for grain storage B) higher prices for machinery
C) lower prices for foreign goods D) higher prices for shipping
 
Answer & Explanation Answer: A) lower prices for grain storage

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration

6 3058
Q:

Which is the first talkie film

Answer

The Jazz Singer in 1927

Report Error

View answer Workspace Report Error Discuss

Subject: Indian Culture

39 3058