Questions

Q:

India’s longest bridge “Dhola-Sadia Bridge” has built over which tributary of the Brahmaputra River ?

A) Kameng River B) Lohit River
C) Subansiri River D) Manas River
 
Answer & Explanation Answer: B) Lohit River

Explanation:

The Prime Minister Narendra Modi has inaugurated India’s longest bridge “Dhola-Sadia Bridge” in Assam on May 26, 2017. This three lane, 9.15 kilometre bridge has been built over river Lohit, a tributary of the Brahmaputra river. It links Dhola in Assam to Sadia. The bridge will reduce the distance from Rupai on NH- 37 in Assam to Meka-Roing on NH-52 in Arunachal Pradesh by 165 KM. The travel time between the two places will come down from the current six hours to just one hour, a total five hour reduction. This will result in saving of petrol and diesel worth Rs 10 Lakh per day. It will also cater to the strategic requirements of the country in the border areas of Arunachal Pradesh, besides facilitating numerous hydro power projects coming up in the state.

Report Error

View Answer Report Error Discuss

Filed Under: Longest, Shortest, Deepest
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

19 4862
Q:

Arrange the following ina proper sequence.

A. Mutation

B. Reproductive isolation

C. Natural selection

D. Evolution

 

A) D,C,B,A B) C,B,A,D
C) A,C,D,B D) A,B,C,D
 
Answer & Explanation Answer: D) A,B,C,D

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: Bank Exams

0 4861
Q:

The Marine Corps philosophy of leadership is based upon developing individual Marine.

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:

The belief that leadership qualities can be developed within the individual Marine, and that leaders have the responsibility for developing those qualities is the Marine Corps philosophy of leadership.


 


The United States Marine Corps, also referred to as the United States Marines, is a branch of the United States Armed Forces responsible for conducting amphibious operations with the United States Navy.

Report Error

View Answer Workspace Report Error Discuss

Subject: World History
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 4858
Q:

In a Certain Code Language PUBLIC is written as MWYNFE. How will SYSTEM be written  in that code language?

A) NANVCO B) OBOVCP
C) PAPVCO D) MAMVCO
 
Answer & Explanation Answer: C) PAPVCO

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams
Job Role: Bank PO

7 4858
Q:

Rifath Sharook has designed the world’s lightest satellite “KalamSat”. He hails from which country  ?

A) Russia B) Pakistan
C) Dubai D) India
 
Answer & Explanation Answer: D) India

Explanation:

Indian teen Rifath Sharook from Tamil Nadu has designed the world’s lightest & smallest satellite named “KalamSat”. The satellite weighs only 64 grams and will be launched by NASA on June 21, 2017. With this, he will become the first Indian student to have his experiment launched by NASA. The main role of the satellite will be to demonstrate the performance of 3-D printed carbon fibre. The satellite has been designed in a way which will have a 240-minute mission in space and will operate for 12 minutes in a micro-gravity environment of space.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

11 4858
Q:

In 1689, which chief of the Maratha Navy effectively controlled the Konkam trade from his headquarters at Kolaba?

Answer

Kanhoji Angre

Report Error

View answer Workspace Report Error Discuss

1 4855
Q:

What Frank Whittle invented?

A) Radar B) Ethyl gasoline
C) Sonar D) Jet propulsion
 
Answer & Explanation Answer: D) Jet propulsion

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Inventions

6 4855
Q:

A process that specifies how formal verification and acceptance of the completed project deliverables will be obtained is a part of which plan?

A) Project integration plan. B) WBS development plan.
C) Configuration management plan. D) Scope management plan.
 
Answer & Explanation Answer: D) Scope management plan.

Explanation:

“The work involved in performing the five processes of Project Scope Management is preceded by a planning effort by the project management team. This planning effort is part of the Develop Project Management Plan process, which produces a scope management plan that provides guidance on how project scope will be defined, documented, verified, managed, and controlled. The scope management plan may be formal or informal, highly detailed, or broadly framed, based upon the needs of the project.”

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

2 4854