Questions

Q:

Mount Abu is a hill station located in _____ ranges.

A) Vindhya B) Satpuda
C) Aravalli D) Sahyadri
 
Answer & Explanation Answer: C) Aravalli

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: Bank Exams

0 802
Q:

The Indian State of Sikkim does not share a border with which neighbouring country?

A) Nepal B) Bangladesh
C) Bhutan D) China
 
Answer & Explanation Answer: B) Bangladesh

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: Bank Exams

5 802
Q:

In the following question, a sentence has been given in Active/Passive voice. Out of the four alternatives suggested, select the one which best
expresses the same sentence in Passive/Active voice.
Once a month we visit the temple.

A) Visiting the temple is done by us once a month. B) We ourselves visited the temple once a month.
C) Once a month the temple is visited by us. D) Monthly there is a visit by us to the temple.
 
Answer & Explanation Answer: C) Once a month the temple is visited by us.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English

0 802
Q:

The sentences given with blanks are to be filled with an appropriate word(s). Four alternatives are suggested for each question. For each question, choose the correct alternative and click the button corresponding to it.

By a single mean act, he _____ out all his good deeds.

A) wiped B) whipped
C) worked D) whisked
 
Answer & Explanation Answer: A) wiped

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 802
Q:

In the following question, out of the four alternatives, select the alternative which will improve the bracketed part of the sentence. In case no improvement is needed, select "no improvement".

I'm (having to) too much fun.

A) having B) had
C) has D) no improvement
 
Answer & Explanation Answer: A) having

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 802
Q:

In the following question, four words are given out of which one word is correctly spelt. Select the correctly spelt word.

A) Alliviate B) Aleviate
C) Alleviate D) Aliviate
 
Answer & Explanation Answer: C) Alleviate

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 802
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


What is the capacity of the Alaskan pipeline?

A) 2 million gallons of crude oil B) 4 million barrels of crude oil
C) 84 million gallons of crude oil D) 84 billion barrels of crude oil
 
Answer & Explanation Answer: C) 84 million gallons of crude oil

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 802
Q:

In the following questions, one part of the sentence may have an error. Find out which part of the sentence has an error and click the button corresponding to it. If the sentence is free from error, click the "No error" option.

If you turn the corner, (A) / you will found a house (B) / built of stone. (C) / No Error (D)

A) A B) B
C) C D) D
 
Answer & Explanation Answer: B) B

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 802