Questions

Q:

Which IT company has developed Financial Core - a banking software product?

A) Wipro B) Satyam
C) Infosys D) TCS
 
Answer & Explanation Answer: C) Infosys

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness

13 4075
Q:

The organizational form in which the project manager has informal authority over team members and little or no input to team member’s performance appraisal is called

A) weak matrix. B) functional.
C) strong matrix. D) composite.
 
Answer & Explanation Answer: A) weak matrix.

Explanation:

“Weak matrices maintain many of the characteristics of a functional organization, and the project manager role is more that of a coordinator or expediter than that of a true project manager.”

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

2 4074
Q:

In case of uniform circular motion, the acceleration is

A) Variable in magnitude but constant in direction B) Constant in magnitude and directed radially inwards
C) Variable in magnitude but tangential to the circle D) Zero
 
Answer & Explanation Answer: A) Variable in magnitude but constant in direction

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics

4 4074
Q:

Power Point presentation is a collection of

A) Outlines B) Slides and Handouts
C) Speaker’s notes D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

Power Point presentation is a collection of Slides and Handouts, Outlines and Speaker’s notes.

Report Error

View Answer Report Error Discuss

3 4074
Q:

Which city has topped the list of most expensive cities for expatriates, according to Mercer’s 2017 Cost of Living Survey  ?

A) Zurich B) Launda
C) Germany D) Toyko
 
Answer & Explanation Answer: B) Launda

Explanation:

Luanda, the capital of Angola, has topped the list of most expensive cities for expatriates, according to Mercer’s 23rd annual Cost of Living Survey. Hong Kong has acquired 2nd position, followed by Tokyo, Zurich, Singapore, Seoul and Geneva. From India, Mumbai is the most expensive city for expatriates that has ranked 57th on the list, followed by New Delhi (99), Chennai (135), Bangalore (166) and Kolkata (184). The Mercer’s survey includes 209 cities across five continents. The world’s least expensive cities for expatriates, according to Mercer’s survey, are Tunis (209), Bishkek (208) and Skopje (206). Mercer’s authoritative survey is one of the world’s most comprehensive, and is designed to help multinational companies and governments determine compensation allowances for their expatriate employees.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

10 4073
Q:

What do you meant by "triple X" in Networks?

Answer

The function of PAD (Packet Assembler Disassembler) is described in a document known as X.3. The standard protocol has been defined between the terminal and the PAD, called X.28; another standard protocol exists between hte PAD and the network, called X.29. Together, these three recommendations are often called "triple X"

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

2 4073
Q:

CPU speed of a personal computer is

A) 1 MIPS B) 100 KIPS
C) 32 KIPS D) 32 MIPS
 
Answer & Explanation Answer: C) 32 KIPS

Explanation:

Instructions per second (IPS) is a measure of a computer's processor speed. CPU speed of a personal computer is 32 KIPS (Kilo Instructions per second).

Report Error

View Answer Report Error Discuss

5 4072
Q:

“C25” India’s first indigenously developed high thrust cryogenic rocket engine has successfully ground-tested by the ISRO for which rocket vehicle? 

A) GSLV-Mark-II B) GSLV-Mark-III
C) GSLV-Mark-IV D) GSLV-Mark-V
 
Answer & Explanation Answer: B) GSLV-Mark-III

Explanation:

India’s first indigenously designed and developed high thrust cryogenic rocket engine generating a nominal thrust of 19 tonnes was successfully endurance hot tested for a duration of 800 seconds on July 16, 2015 at ISRO Propulsion Complex, Mahendragiri.

 

The engine will be used for powering the Cryogenic stage (C25), the upper stage of the next generation GSLV Mark-III launch vehicle of ISRO, capable of launching four tonne class satellites.

 

This cryogenic engine of C25 Stage operates on Gas Generator Cycle using extremely low temperature propellants – Liquid Hydrogen (LH2) at 20 Kelvin (-253 deg C) and Liquid Oxygen (LOX) at 80K (-193 deg C).

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness

8 4071