Questions

Q:

Which is the World's highest bridge standing 1850 ft above a gorge opens?

A) Sidu Bridge B) Millau Via-duct
C) Beipanjiang Bridge D) Puli Bridge
 
Answer & Explanation Answer: C) Beipanjiang Bridge

Explanation:

Duge Beipanjiang Bridge in southwest China, opened to traffic this week and now the highest bridge in the world, some 565 metres (1,854 feet) above the valley below.The bridge stretches across a 1,341-metre (4,400-foot) span. Three years in the making, it's estimated to have cost the Chinese government around 1 billion yuan (or US$144 million).The bridge is going to cut travel times between Liupanshui in the Guizhou province and Xuanwei in the Yunnan province to two hours instead of the current five – as long as you don't mind the heights.The bridge crosses the the Nizhu river, and to give you some idea of the size of the drop down to the water below, it's almost 2 Eiffel Towers or one-and-a-half Empire State Buildings.

Report Error

View Answer Report Error Discuss

Filed Under: Longest, Shortest, Deepest
Exam Prep: Bank Exams , CAT , GATE , GRE
Job Role: Bank Clerk , Bank PO , Network Engineer

11 4403
Q:

Whose winter residence did potala palace serve as till 1959 ?  

A) Jodhpur Maharaj B) Dalai lama
C) Pope D) Nepal Raju
 
Answer & Explanation Answer: B) Dalai lama

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World History

10 4403
Q:

Earlist thermometerr was developed by

A) Celsius B) Fahrenheit
C) Kelvin D) Galileo
 
Answer & Explanation Answer: D) Galileo

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics

5 4402
Q:

Arjuna Award was introduced in _____ ?

A) 1971 B) 1961
C) 1951 D) 1987
 
Answer & Explanation Answer: B) 1961

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Honours and Awards
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

8 4399
Q:

What is the fastest of all the birds?

A) Blood phesant B) Swift
C) Sparrow D) None
 
Answer & Explanation Answer: B) Swift

Explanation:

Swift is the fastest among all the birds in India

Report Error

View Answer Report Error Discuss

Filed Under: Animals and Birds

42 4397
Q:

Which of the following is the state animal of Chhattisgarh?

A) Tiger B) Wild Buffalo
C) Blue Bull D) Wild Ass
 
Answer & Explanation Answer: B) Wild Buffalo

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Animals and Birds

22 4397
Q:

Which Article of the Constitution of India accords Special status to the state of Jammu and Kashmir?

A) 311 B) 324
C) 356 D) 370
 
Answer & Explanation Answer: D) 370

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics

6 4396
Q:

Describe how to perform Risk Analysis during software testing.

Answer

While a test plan is being created, risks involved in testing the product are to be taken into consideration along with possibility of their occurrence and the damage they may cause along with solutions; if any. Detailed study of this is called as Risk Analysis.


Some of the risks could be:


New Hardware 


New Technology 


New Automation Tool 


Sequence of code delivery 


Availability of application test resources 


Identify and describe the risk magnitude indicators: High, Medium and Low


High magnitude means the effect of the risk would be very high and non-tolerable. Company may face severe loss and its reputation is at risk. Must be tested.


Medium: tolerable but not desirable. Company may suffer financially but there is limited liability or loss of reputation. Should be tested.


Low: tolerable. Little or no external exposure. Little or no financial loss. Company’s reputation unaffected. Might be tested.


Three perspectives of Risk Assessment: Effect, Cause and Likelihood.


To assess risk by Effect, identify a condition, event or action and try to determine its impact.


To asses risk by Cause is opposite of by Effect. Begin by stating an undesirable event or condition and identify the set of events that could have permitted the condition to exist.


To asses risk by Likelihood is to determine the probability that a requirement will not be satisfied.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 4395