Quantitative Aptitude - Arithmetic Ability Questions

Q:

A right triangular pyramid XYZB is cut from cube as shown in figure. The side of cube is 16 cm. X, Y and Z are mid points of the edges of the cube. What is the total surface area (in sq.cm) of the pyramid?

 

A) 48[(√3) + 1] B) 24[4 + (√3)]
C) 28[6 + (√3)] D) 32[3 + (√3)]
 
Answer & Explanation Answer: D) 32[3 + (√3)]

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Volume and Surface Area
Exam Prep: Bank Exams

2 1610
Q:

Manish can complete a work in 21 days and Karan can complete the same work in 28 days. If both together work for 7 days, then what fraction of total work is left?

 

A) 3/5 B) 2/3
C) 7/12 D) 5/12
 
Answer & Explanation Answer: D) 5/12

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: Bank Exams

3 1609
Q:

Select the odd word from the given alternatives.

A) Nylon B) Wool
C) Silk D) Cotton
 
Answer & Explanation Answer: A) Nylon

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Odd Man Out
Exam Prep: Bank Exams

0 1609
Q:

A boat moves down stream at the rate of 8km/hr. and upstream at 4Km/hr. The speed of the boat in still waters is:

A) 4.5 km/hr. B) 5 km/hr.
C) 6 km/hr. D) 6.4 km/hr.
 
Answer & Explanation Answer: C) 6 km/hr.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Boats and Streams
Exam Prep: Bank Exams

4 1607
Q:

A cuboid has dimensions 8 cm x 10 cm x 12 cm. It is cut into small cubes of side 2 cm. What is the percentage increase in the total surface area?

A) 286.2 B) 314.32
C) 250.64 D) 386.5
 
Answer & Explanation Answer: D) 386.5

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Volume and Surface Area
Exam Prep: Bank Exams

1 1607
Q:

The area of the largest sphere ( in cm2) that can be drawn inside a square of side 18 cm is

A) 972Π B) 11664Π
C) 36Π D) 288Π
 
Answer & Explanation Answer: A) 972Π

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams

3 1606
Q:

Working together A and B can do a job in 40 days, B and C in 36 days and all three together in 24 days. In how many days can B alone do the job?

A) 60 B) 90
C) 72 D) 120
 
Answer & Explanation Answer: B) 90

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: Bank Exams

2 1605
Q:

In what time will a train, 60 metres long, running at the rate of 36 km/hr pass a telegraph post?

A) 9 seconds B) 8 seconds
C) 7 seconds D) 6 seconds
 
Answer & Explanation Answer: D) 6 seconds

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: Bank Exams

0 1604