Quantitative Aptitude - Arithmetic Ability Questions

Q:

The market value of a 10.5% stock, in which an income of Rs. 756 is derived by investing Rs. 9000, brokerage being 14%  is :

A) Rs.108.25 B) Rs.112.20
C) Rs.124.75 D) Rs.125.25
 
Answer & Explanation Answer: C) Rs.124.75

Explanation:

For an income of Rs.756, investment = Rs.9000 

 

For an income of Rs.212, investment = Rs.9000756*212 = Rs.125 

 

For a Rs.100 stock, investment = Rs.125.

 

Market value of Rs. 100 stock  = Rs.125-14 = Rs. 124.75

Report Error

View Answer Report Error Discuss

Filed Under: Stocks and Shares

4 9786
Q:

5 men and 3 boys can together cultivate a 23 acre field in 4 days and 3 men and 2 boys together can cultivate a 7 acre field in 2 days. How many boys will be needed together with 7 men, if they cultivate 45 acre of field in 6 days.

A) 6 B) 4
C) 2 D) 3
 
Answer & Explanation Answer: C) 2

Explanation:

Let work done by 1 man in i day be m

and Let work done by 1 boy in 1 day be b

From the given data,

4(5m + 3b) = 23

20m + 12b = 23....(1)

2(3m + 2b) = 7

6m + 4b = 7 ....(2)

By solving (1) & (2), we get

m = 1, b = 1/4

Let the number of required boys = n

6(7 1 + n x 1/4) = 45

=> n = 2.

Report Error

View Answer Report Error Discuss

7 9786
Q:

1747 + 13212 - ? = 1123

A) 16 B) 17
C) 18 D) 19
 
Answer & Explanation Answer: D) 19

Explanation:

1747 + 13212 - ? = 1123

1237 + 15812 - ? = 353

=> ? = 1237 + 15812 - 353

=> ? = 1476 + 1106 - 98084

=> ? = 19.07

Report Error

View Answer Report Error Discuss

Filed Under: Simplification
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

13 9769
Q:

A group of men can complete a job in K hours. After every 4 hours, half the number of men working at that point of time leave the job. Continuing this way if the job is finished in 16 hours, what is the value of K ?

A) 7 hrs B) 7.5 hrs
C) 8 hrs D) 8.25 hrs
 
Answer & Explanation Answer: B) 7.5 hrs

Explanation:

Let there are L men

job requires LK man hours.

 

job completed in first 4 hrs = L x 4 = 4L

job completed in next 4 hrs = 4 x L/2 = 2L

job completed in next 4 hrs = 4 x L/4 = L

job completed in last 4 hrs = 4 x L/8 = L/2

4L + 2L + L + L/2 = KL

K = 7+1/2 = 7.5 hours.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: TOEFL , GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

5 9747
Q:

The interest on Rs.750 for 2yrs is the same as the True Discount on Rs.960 due 2yrs hence . If the rate of interest is same in both cases,it is:

A) 12% B) 14%
C) 15% D) 16
 
Answer & Explanation Answer: B) 14%

Explanation:

S.I on Rs.750= T.D on Rs. 960 

This means P.W of Rs. 960 due 2 years hence is Rs.750 

Therefore , T.D= Rs. (960 - 750) = Rs. 210 

Thus, S.I on Rs. 750 for 2 years is Rs. 210 

Rate =[ (100 x 210) / (750 x 2) ] % = 14%

Report Error

View Answer Report Error Discuss

Filed Under: True Discount

1 9740
Q:

A jogger is running at 9 kmph alongside a railway track is 240 meters ahead of the engine of a 120 meters long train running at 45 kmph in the same direction. In how much time will the train  pass the jogger ?

A) 48 sec B) 36 sec
C) 18 sec D) 72 sec
 
Answer & Explanation Answer: B) 36 sec

Explanation:

Speed of the train relative to jogger = (45-9) km/hr = 36 km/hr =(36*5/18) m/sec  = 10 m/sec

Distance to be covered =(240 + 120)m = 360 m

 Time taken = 360/10 sec = 36 sec

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains

11 9733
Q:

88 cubic centimetres of silver is drawn into a wire 1 mm in diameter. The length of the wire in metres will be ?

A) 112 mts B) 84 mts
C) 96 mts D) 108 mts
 
Answer & Explanation Answer: B) 84 mts

Explanation:

Vol of silver = πR2h  = 66 C.C  

Given D= 1mm => R = D/2 = 1/20 cm  

 

=> 227×1202×h = 66

= 66 x 400 x (7/22) = 8400 cm = 84 mtrs.

Report Error

View Answer Report Error Discuss

Filed Under: Volume and Surface Area
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank Clerk

11 9731
Q:

K can build a wall in 30 days. L can demolish that wall in 60 days. If K and L work on alternate days, when will the wall be completed ?

A) 120 days B) 119 days
C) 118 days D) 117 days
 
Answer & Explanation Answer: D) 117 days

Explanation:

K's work in a day(1st day) = 1/30
L's work in a day(2nd day)= -1/60(demolishing)
hence in 2 days, combined work= 1/30 - 1/60 =1/60
since both works alternatively, K will work in odd days and L will work in even days.
1/60 unit work is done in 2 days
58/60 unit work will be done in 2 x 58 days = 116 days
Remaining work = 1-58/60 = 1/30
Next day, it will be K's turn and K will finish the remaining 1/30 work.
hence total days = 116 + 1 = 117.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

13 9726