A work can be completed by 18 boys in 24 days. If 6 boys leave after working for 12 days, then how many days will be needed to complete the remaining work?
If O is the centre of a circle of radius 5 cm. At a distance of 13 cm from O, a point P is taken. From this point, two tangents PQ and PR are drawn to the circle. Then , the area of quadrilateral PQOR is
The radius of a cylindrical milk container is half its height and surface area of the inner part is 616 sq.cm. The amount of milk that the container can hold, approximately, is [ Use : √5 = 2.23 and π = 22/7 ]