If the volumes of two right circular cones are in the ratio 1:4 and their diameters of bases in the ratio 4:5, then their heights will be in the ratio:
A can do a piece of work in 10 days, B can do it in 12 days and C can do it in 15 days. In how many days will A, B and C finish it, working all together?